Solar Park Installation & Stakeout – 230 Points Per Hour
Vandel, Denmark – Solar Park – Energi Innovation

Vandel Solar Park – Energi Innovation

Energi Innovation, a Danish green energy EPC and project development company was contracted to install a large-scale solar park at Vandel in Denmark. The solar park will have an estimated power output of 162 MwP.

115,000 Points – 230 Points an Hour

Vandel Solar Park and Energi Innovation needed to mark out 115,000 points for the positions of the piles for the solar panels. Normally to do this, a person would first manually mark an end point, then mark the second end point of a panel row. Following this, the two end points would be connected in a manual way, including the use of tape measures to mark the lines of the panel rows. This would be repeated across large distances and for each of the panel rows.

To make this process more efficient, Energi Innovation used the TinySurveyor to set out all the points. The existing data could easily be loaded and used by the robot, saving the crew a lot of time and work. The autonomous robot for solar park set-out averaged 230 points per hour during this project.

Vandel solar park – zoomed out

Key Specifications

TinyPremarker-Vandel

Powerful Tablet Solution

The TinySurveyor comes with a tablet and an app. The robot settings can be fully customized to suit your needs. Simply insert your data into the app, turn on the robot, start the robot and start saving time.

TinyMobileRobots TinySurveyor Terra working with the tablet terra in the background
TinySurveyor-TinyPreMarker-tablet-solution-for-autonomous-robot

Sign Up for Regular Updates

TinyMobileRobots TinySurveyor Terra pre-marking road grey yellow contast

Get a Quote

Tell us a little about your work and get a tailored, non-binding quote.

This will help you determine which field painter is the right fit for you and your organization.

TinyMobileRobots TinyLineMarker Pro X portrait front